• Nebyly nalezeny žádné výsledky

section of the trench

N/A
N/A
Protected

Academic year: 2022

Podíl "section of the trench"

Copied!
1
0
0

Načítání.... (zobrazit plný text nyní)

Fulltext

(1)

ADMINISTRATIVE BUILDING

5018/1 4992/11

5022

4992/10

4992/2

4992/1 5027

water supply DN 100

Reservoir

PAK MINI 4992/2

LEGEND

number of plot

public water supply

existing administrative building

asphalt road number of building 5022

boundary of plot

existing building on the plot

pedestrian walkway front garden horizontal collector

section of the trench

sand

horizontal collector

1:50

DESCRIPTION OF HORIZONTAL COLLECTORS

Spacing between pipes

Total area of heat collectors Type of reservoir

Connection of reservoir Length of 1st circuit Length of 2nd circuit

Dimensions of reservoir

1 m

460 m² PAK MINI

right 256 m 256 m

715x480 mm

Depth of piping 1,2 m below the ground

energy sources

Heating system with renewable

Bachelor project - Department of Microenvironmental and Building Services Engineering

HEATING SYSTEM - SITUATUIN

Name

Attachment Student

Aneta Burešová 2015-2016

Bachelor thesis supervisor

Ing. Daniel Adamovský, Ph.D.

Academic year

CTU

Consultant Date Scale

5/2016 M 1:500

Number

4

± 0,000 = 153 m.a.s.l.

Odkazy

Související dokumenty

Multi-robot motion planning is a generalization of a more widely studied problem of single-robot motion planning. Moreover, many of the algorithms for multi-robot motion

The main three methods of diagnostics are described: impedance spectroscopy, electroluminescence and flash test measurement?. In the second part, these three method

Each relay on the board has the same circuit, and the input ground is common to all four channels. Because there is an optional additional layer of isolation, the driver circuit

Czech Technical University Faculty of Electrical Engineering Department of Control Engineering Examination board/Ph D.. CTU Diploma Project Review Kiruna, September

Bachelor project - Department of Microenvironmental and Building Services Engineering

Bachelor project - Department of Microenvironmental and Building Services Engineering

- all piping will be assembled in a manner, which allows the system to be vented and drained - the pipe installation will be carried out in accordance with the

Department: Department of Indoor Environmental and Building Services Engineering Thesis supervisor: Assoc..