V3 V2
V2 V2
V2 R1
V2
R3
F E
D C
B
A 12
H2 H1
H1 H1
H2
H3
H1 H1 H1 H1
H1 H2
H3
H1 H1
H1
H2
H3
H3 H1
H1
H1 H1
H3 H4 H4
ORIGINAL TEREIN
TEREIN AFTER SKRIPING -3,350 = +259,100
UNDERGROUND LEVEL
-3,350 = +259,100
UNDERGROUND LEVEL
1 LEVEL 1 LEVEL
+3,000 = +265,450 2 LEVEL
+3,000 = +265,450 2 LEVEL
4 LEVEL
+6,000 = +268,450 3 LEVEL
5 LVEL 5 LEVEL
+15,000 = +277,450 ROOF
+15,000 = +277,450 ROOF
H2
H1
4 LEVEL
+6,000 = +268,450 3 LEVEL
+9,000 = +271,450 +12,000 = +274,450
+9,000 = +271,450 +12,000 = +274,450
H1 H1
DRAWING
PART
BUILDINGSTRUCTURE
Drawing nr.
OBJECT
datum CREATED BY
CONSULTED
WITH
Ing. Malila Noori, Ph.D.
scale
05 / 2018
SECTION B-B
1 : 50
9.
Malathe Alkhateeb
Nr A4 PURPOSE